You can see more about structured problem-solving with the Kolb Learning Styles Inventory at * Hayes
You can view examples of screens by clicking on the hotlinks for *__ Screen, such as * LaPS Screen for Access.
You can manage your Total Quality and Management Information System program with your Learning and Problem-Solving, LaPS, module. Much of the decision process takes advantage of a Suggestion Program. The suggestions may be input to the database and displayed in the problem-solving forms.
You can view an example at * Suggestion Screen
Your LaPS templates will provide you with a single integrated database form and reports for recording data about any particular operation in your organization. After you have described your operations as they really are, then you can use your StrongForm for documenting problem-solving and decision-making information. The form provides for tracking data for: Quality Control; Production Quantity; Financial Planning; Scheduling; Structured Problem-Solving; and coordination.
If you want to record more data than the screens provide space for,
then you can use a word processor text file to contain the extra data.
Your StrongWare provides reports that you can use to print to file and
then open with your word processor so you can add as much as you want to,
for your WorkPlans or LaPS.
You can then develop spreadsheet models and budgets for your organization as described in
* Modelling and * Budgetting .
The following is an Extract from System Operator's Guide for LaPS
StrongWare gives you a way to solve problems in a structured method that
uses industrial psychology. The method suggests using a team composed of
folks who have identified their learning styles as one of four types and
then organizes the folks to solve parts of the problem in a four-step
sequence that takes advantage of their strengths. You can check it out in the
* Learning Styles Inventory, LSI .
If you decide to use the LSI method, you can also send
the LSI spreadsheet that has LSI matrices, as in Plate 13 of COSMIC WISDOM,
to all concerned. You can use your LSI, to fill in to find your own
particular style and those of your Team Members.
You and your Team Members can scan your LargSyst example spreadsheet and your COSMIC WISDOM booklet, p.16, para. 25 and paras. 9.4 and 9.9 and your Justices example spreadsheet model to see a Computerized Organizational System Model for Integrated Control, COSMIC, then create their own sub-COSMICs.
Modeling via LLaPSSS Translators. You can create your COSMIC of your organization, similar to a 'fishbone' TQM diagram in COSMIC WISDOM, page 9, para. 15.
+----------------------------------------------------------+
| To Customers >>> |
| > > > > >> |
| / / / / / |
| / / / / / |
|======================= Team ==========================>> |
| / / / |
| / / / |
| > > > |
| >>> From Suppliers |
|__________________________________________________________|
| |
| +--------\ +----------\ +-------------+ |
| Customers >>>>Requirements>\ >> Satisfaction | |
| +--------/ +----------/ \ / +-------------+ |
| +--------\ +--------\ \ +-----\ / |
| TQM Team >->- Process >->->-> Solve >/ |
| +--------/ +--------/ / +-----/ |
| +--------\ +----------\ / |
| Suppliers >>>> Resources >/ |
| +--------/ +----------/ |
+----------------------------------------------------------|
| Plate 12 - Fishbone to COSMIC |
+----------------------------------------------------------+
15. Fishbone to COSMIC. See Plate 12. The well-known TQM
fishbone is an excellent starting point for defining the process
and the people and functions that are involved in the process.
Simply converting the fishbone into a COSMIC might improve
structuring the process and setting it up for including the
other COSMIC capabilities described above.
| | | | | | | | ³
| Planning| Design| Mrkt'g | Proto | Test | Proc | Mfg | Sales ³
____________|_________|_______|________|_______|______|______|______|_______³
Management | | | | | | | | ³
____________|_________|_______|________|_______|______|______|______|_______³
Personnel | | | | | | | | ³
____________|_________|_______|________|_______|______|______|______|_______³
Finance | | | | | | | | ³
____________|_________|_______|________|_______|______|______|______|_______³
Testing | | | | | | | | ³
____________|_________|_______|________|_______|______|______|______|_______³
Engineering| | | | | | | | ³
____________|_________|_______|________|_______|______|______|______|_______³
Production | | | | | | | | ³
____________|_________|_______|________|_______|______|______|______|_______³
Facilities | | | | | | | | ³
____________|_________|_______|________|_______|______|______|______|_______³
Equipment | | | | | | | | ³
____________|_________|_______|________|_______|______|______|______|_______³
³
Plate 19 - LaPSMap ³
You can download an Excel 5 version of a * LaPSMap
/SW\ Learning and Problem-Solving, LaPS, Record RECNO: 1
About: TQM Mgmt Info Syst LaPS Team Date: 10/27/1997 HAZBEN Rec#: Hap10
DB FileName: LAPS0001 LAPS Rec#: LaPS0001 Prev: na TXT: na Prs#: 002
SS FileName: LAPSBEN C-R: G6 Budget Item: Software/StrongWare WrkRecId: SW0001
Line / Sub-Item:Top management Phase: All decision-making
1. Diverger/Idea Generators choose a goal and distinguish it from reality.
a. Goals/ Objectives: Manage with best information efficiently and effectively.
b. Reality/ Concerns: Knowledge engineers with tools to identify problems quickly.
c. Suggestion/Concern: Multiple isolated documents/ poor optimizing/ graphing.
2. aSIMmilators identify factor, metric and select a suggestion/ problem to solve.
a. Problem/Suggestion: Information is not set up for efficient decision-making.
b. Select-PRO_______: Share on PC E-Mail. Rapid updates & searches & translation.
c. Select-CON_______: Still need some printing. Cost of PCs & software & training.
3. Converger/Optimizers/Judges consider alternate solutions and evaluate them.
a. Solution Set_____: Off-shelf software cuts development/ training costs.
b. Evaluation_______: Detail in database related to spreadsheet for dynamic model.
c. Recommendations__: Survey for interest & develop standard screens & forms.
4. Worker/Accomodator/Implementers select one solution and implement it.
a. Solution Selectd_: Demonstrate with current system/ compare with old methods.
b. Implementation___: Gather feedback from users about their reactions and desires
c. Recommendations__: COSMIC databases and models are better/ cost-effective!
6. SCHEDULE: Duration: Real: 50.00 Prob: . Pro: . Con: . Imp: . ~ hhh.hh Prob.Duration 50.00 . . . .
Probable Avoidance of Schedule: 50.00 Re> 50.00 minus . => .
If you use Microsoft Access 7 and you prefer to enter more text in each field, then you can use the LaPS2 database, form and report that provides twice as much space for each field.
The Strongware LaPS database StrongForm is shown above and the LaPSMOST
StrongForm is shown below. The main sections are for:
- administrative data;
- quality control and assurance data;
- modeling an event and problem-solving;
- evaluation in terms of dollars and quantities for periods and life cycle;
- scheduling events, in the model; and
- coordination among team members.
Note: The example templates shown on this webpage are the word processing text templates that you can *Download To view examples of screens, click on the hotlinks for *__ Screen.
/SW\ Learning and Problem-Solving, LaPS, Record RECNO: 1
About: TQM Mgmt Info Syst LaPS Team Date: 10/27/1993 HAZBEN Rec#: ap10
DB FileName: LAPS0001 LAPS Rec#: ap10 Prev: ap0.00 TXT: Prs#: 002
SS FileName: LAPSBEN C-R: G6 Sub-Phase: All decision-making WrkRecId:J00001
Line / Sub-Item:Top management Budget Item: Software/STRONGWARE
Quality Control: Target; 100.00 Upper Limit; 110.00 LowerLimit; 90.00
1. Diverger/Idea Generators choose a goal and distinguish it from reality.
a. Goals/ Objectives: Manage with best information available efficiently and effectively.
b. Reality/ Concerns: Knowledge engineers with tools to identify problems quickly.
c. Suggestion/Concern: Multiple isolated documents/ poor optimizing/ graphing.
2. aSIMmilators identify factor, metric and select a suggestion/ problem to solve.
a. Problem/Suggestion: Information is not set up for efficient decision-making.
b. Select-PRO_______: Share on PC E-Mail. Rapid updates & searches & translation.
c. Select-CON_______: Still need some printing. Cost of PCs & software & training.
3. Converger/Optimizers/Judges consider alternate solutions and evaluate them.
a. Solution Set_____: Off-shelf software cuts development/training costs.
b. Evaluation_______: Detail in database related to spreadsheet for dynamic model.
c. Recommendations__: Survey for interest & develop standard screens & forms.
4. Worker/Accomodator/Implementers select one solution and implement it.
a. Solution Selectd_: Demonstrate with current system/ compare with old methods.
b. Implementation___: Gather feedback from users about their reactions and desires
c. Recommendations__: COSMIC databases and models are better/cost-effective!
5. Evaluation and Decision-Making :
Period(MQYDC): Y Life~Per: 10.0 Ops/Per: 9999 Invest Rate: 0.080 Borrow Rate: 0.120
Units: 93US$k REAL: PROB/SUG: PRO: CON: IMPLEMENT:
P- Probable Occur per Period: 0.910 0.090 0.050 0.050 1.250 Total
M- Money Cost Expenses /Cash: -99.00 -99.00 -90.00 -10.00 -20.00 Startup:
O- Operational Effect Output: 200.00 0.00 200.00 0.00 0.00 -50.00
S- Safety/ Environ/ Insuranc: -10.00 -40.00 -10.00 -45.00 -10.00
T- Time/ Schedule/ Opportuny: -50.00 -250.00 -10.00 -100.00 -10.00
F- Spec.Fac.special factor : 0.00 50.00 0.00 0.00 0.00 Startup
Q- Qual.Met.quality metric : 2.00 -10.00 0.00 0.00 0.00 Payment:
PPVs, Probable Period Values: 39.13 -31.41 85.50 -7.75 -8.85
Compare Problem vs. Pro+Con+Imp: 7.72 <vs.> 68.90=> 61.18 Avoid Break Even: 1.45
Probable Future Value, PFV: 112 <VS.> 998 => 886 GAIN Gain Ratio: 8.92
Quantity: Real; 100.00 Problem; -10.00 Pro; 110.00 Con; -5.00
Prob.Per.Qty: 91.00 - .90 104.50 -0.25
Compare R+B vs. P+C: 90.10 vs. 104.25 => 14.15 Gain 141.50 Life Gain
6. SCHEDULE: Start Date: 04/15/1995 Duration: 397 EndDate: 05/16/1996
Start Time: 7.75 Timespan: 9.50 End Time: 17.25
7. LaPS TEAM INTEGRATION AND COORDINATION:
Person 1: SIC; Job Code; 0 Age; 0 Person 2: SIC; Job Code;
0 Age; 0
______DIGers______ _______SIMmers______ _______COJers______ _____WAIers_____
Plans: ok S & V: tb Finan: tb ProgM: tb Facil: tb HuFac:tb Labor: tb Test: tb
SSafe: tb SEngr: tb Legal: tb C&DM : tb Prodn: tb Envir:tb QualA: tb Opern: tb
R & D: tb SReli: tb Purch: tb Persl: tb Sales: tb
8. CONTACT: Name: Dick Strong Address: Safety Analysis Systems Co.
Telephone: 513-236-0361 FAX: 513-236-2113 E-MAIL:
RichStrong@aol.com
Remarks: Example with fictitious numbers; CTRL-F9 for recalculation.
OLE BMP: (Copy / Paste ) OLE Spreadsheet: ( Copy / Paste or Insert as Icon )
+-------------------------------+ +------------------------------------------------+
| | | |
| | | |
| | | |
| | | |
+-------------------------------+ +------------------------------------------------+
/SW\ L a P S L o g R e p o r t AS OF: 10/27/1993 Page #: 1
LaPSRec#: Date: Budget Item:
Reality:
Problem: Probable Periodic
Pro: Gains In
Con: Value Quantity
--------------------------------------------------------------------------------
Last Name: Strong
Line Item: Top management
LaPS0001 10/27/1997 Software/StrongWare
Knowledge engineers with tools to identify problems quickly.
Information is not set up for efficient decision-making. 39.13 91.00
Off-shelf software cuts development/ training costs. -31.41 -0.90
Still need some printing; cost of PCs & software & training. 68.90 104.25
Gain= Pro + Con - Real - Problem 61.18 14.15
Sub-Totals by Last Name: Reals + Problems: 7.72 90.10
Alternative Solutions: 68.90 104.25
Strong Sums Gains: 61.18 14.15
TOTAL SUMS Reals + Problems: 7.72 90.10
Alternative Solutions: 68.90 104.25
Gains: 61.18 14.15
You can use your Windows LaPSP report, printed in landscape on viewfoil, for presentations at meetings.
In Stage 1, you can create a database of record-events for your system with your DIGgers' inputs describing your organization as it is, 'Real', and a model, or "System LaPS MAP", or "Strategic Business Plan", using your LLaPSSS translator. You can survey your Team to define Special Factors and Quality Metrics for your organization.
As an alternative and cross-check, you can use the blank LLaPS100
spreadsheet to create a set of preliminary flowcharts.
Members can then evaluate their
sub-COSMICs with estimates of the Money Cost and Output Revenues,
using their WorkPlan input to MOST4IRS*.
They can use a Record ID
for a particular event using the column-row, with the suffixes
shown in 5..3., using the notion that each sub-org is related to
a row as a line item.
They can feedback their LaPS records to
you, who can then import them into your LaPS database.
You can
then query/find their records for the event, then use the TeamLog
report to aggregate their records, then enter the sums data into
your main record and into your System LaPS MAP.
Experience has
shown that a big benefit of using LaPSMap is clarifying
relationships between sub-orgs.
*Example of using MOST4IRS spreadsheet for determining figures. REAL / DESIRED "M-Money" Pt II EXPENSES 8 Advertising 0 "O-Operational Effectiveness" 9 * Bad debts 0 Pt I INCOME: 10 Car expense 0 1 Gross receipts 66 11 Commissions & Fees (Bank 0 2 Returns/Allowances 1 12 Depletion 0 3 Subtract 2 from 1 65 13 Depreciation expense 0 Pt III CoGS From Workplan Inserted 14 Employee benefits 0 33 Inventory @ begin year 3 15 * Insurance 11 34 Purchases less personal 1 16 Interest Mortgage/other 0 35 Cost of labor 1 17 Legal & professional 0 36 Materials & Supplies 1 18 Office expense 11 37 Other costs 1 19 Pension & profit-sharing 0 38 Sum L33..L37 7 20 Rent or lease 0 39 Inventory @ end of year 3 21 * Repairs & maintenance 9 40 Cost of Goods Sold 0 22 Supplies 0 4 Cost of Goods Sold 0 23 Taxes & Licenses (ProfEn 0 5 Gross Profit 65 24 Travel,meals, entrtnmnt 12 6 Other Income 1 25 Utilities 0 7 Gross Income 66 26 Wages (less jobs credit) 0 27 Other expenses 1 28 TOTAL EXPENSES 44 -Bad Debts-Ins.-Repairs 24 29 Tentative Profit 22 Money Cost 24 Output 66 *Safety 20You can scan ahead to Phase 10, Modelling, paragraph 10.1, to see how you can conclude your COSMIC models with columns for totals that you can summarize in your "bottom line", that is, your organization's 'Organizational Output Effectiveness' and 'Organizational Output / Money Gain Ratio' that you can calculate into a 'Organizational % Rate of Return'. You can allocate this 'OROR' to sub-organizations on a pro rata basis by applying it to each event's Real Money Cost to get your Event Real ROR., 'EROR'. As an example, if your OROR is 30%, and your Real Event Money Cost is $100, then your Event Real Output would be $130.
Translating LLaPSSS. You can use your LLaPSSS ( "Little LaPSSS" ) reports for translation for preliminary modelling with information about your Reals, including scheduling phases. You can review 2.8 and 2.9.
( Name) Strong ( Tel#: ) 937-237-8204
(About) TQM Mgmt Info Syst LaPS Team
(Line Item) Top Management
(Phase) All decision-making
04/15/1996 ; 397 ; 05/16/1997
7.75 ; 9.50 ; 17.25
( Col-Row:) G6 ( LaPSRec#: ) LaPS0001
Knowledge engineers with tool to identify problems quickly. ; 39.13; 91.00
You can enter your data, translate into your spreadsheet, and
arrange your model to look like this:
+----------------------+------+----------+
| All decision-making | | |
| 04/15/1996 | 397|05/16/1997|
| 7.75 | 9.50| 17.25 |
+----------------------+------+----------+
+-----------------------+ +----------------------+------+----------+
| Strong 236-0361 | | G6 LaPS0001 | | |
| TQM Mgmt Info Syst >>>> Knowledge engineers | 39.13| 91.00|
| LaPS Team | |with tool to identify | | >>
| Top Management | | problems quickly | | |
+-----------------------+ +----------------------+------+----------+
Process Translator. You may want to expand your model with your 'Problem';
you can describe your Real and Problem losses. LaPSSS Translators. You can use your LaPSSS to input solution information as in Step 3. As your Team progresses with the: 2.a. 'Pro'; 2.b 'Con'; 3.a. 'Evaluation', and 4.b. 'Implementation' and decision to improve, you can insert another set of rows into your model for your third stage solution.
In Stage 3, your COJers can add in alternative solutions and evaluate them. You can use the LaPSSS translator in this stage to revise the LaPS Map with 'Pro' and 'Con' and 'Imp' data. You can distribute the revision to the Members, who can then determine impacts and return them to you. You can aggregate and revise the LaPS Map and distribute again.
Strong 800-267-6420
TQM Mgmt Info Sys LaPS Team
Top Management
Decision-making
04/15/1996; 397; 05/16/1997
7.75; 17.25; 9.50
G6 LaPS0001
Knowledge engineers with tool to identify problems quickly. ; 39.13 ; 91.00
Information is not set up for efficient decision-making. ;-31.41 ; -.90
Real + Problem ; 7.72 ; 90.10
Share on PC E-Mail. Rapid updates & searches & translation. ; 85.50 ; 104.50
Still need some printing. Cost of PCs & software & training. ;- 7.75 ; -0.25
Gather feedback from users about their reactions and desires ;- 8.85 ;
Pro + Con + Implement ; 68.90 ; 104.25
Prob. Periodic Value Gain ; 61.18 ; 14.15
Prob. Future Value Life Gain ;886.29 ; 141.50
You can rearrange your object to standard format to look like this:
+======================================+
| G6 LaPS0001 | | |
|----------------------+------+------ |
| Knowledge engineers | 39.13| 91.00 >>>>>>>>>>>>>>> Real Path >>>>>>>>>>>>
>X>>>>X>> with tool to identify| | |
>\Or \An| problems quickly. | | | First and second stage modelling.
\ \ |----------------------+------+------ | with LLaPSSS and Process.
\ \ | Information is not |-31.41|- .90 |
\ \>> set up for efficient | | >>>>>>>>>>>>>>>>>> Problem Path >>>>>>>
\ | decision-making. | | |
\ |----------------------+------+------ |
\ | Real + Problem | 7.72| 90.10 |
\ +======================================+
\ +======================================+
\ | Share on PC E-Mail. | 85.50|104.50 |
\>>>>X>> Rapid updates/ | | >>>>>>>>>>>>>>>> Pro Path >>>>>>>>>>>>
\An| search/translate. | | | This is third stage problem-solving
\ |-----------------------+------+------ | and fourth stage implementation and
\ | Still need some |- 7.75| -0.25 | verification with LaPSSS.
\>> printing. Cost of PCs | | >>>>>>>>>>>>>>>> Con+Imp Path >>>>>>>>
| software/training | | |
|-----------------------+------+------ |
| Gather feedback from |- 8.85| |
| users about their | | |
| reactions/ desires. | | |
|-----------------------+------+------ | Note: you can stack additional
| Real + Pro + Con + Imp| 68.90|104.25 | problems below, then paste in
|-----------------------+------+------ | corresponding solutions below,
| Prob. Periodic Gain | 61.18| 14.15 | with paths to the system.
| Prob.Future Value Gain|886.29|141.50 |
+======================================+
You can scan ahead to Phase 10, paragraphs 10.1 on page 47, to see how to arrange your model with right-hand columns for success and problems and solutions as relates to your organizational COSMIC. You can scan the Note about doing 'Quick Looks'.
b. In Stage 4, your WAIers can implement and verify your Solutions COSMIC and feed back their recommendations. Implementation may be pilot projects so you can verify or modify the estimated figures.
If the solution proves out and a decision is made to implement it, then you can update your data and models.
Back to -> *Home